Innovative Pipeline Cleaning Solutions

35 Submissions
$20,000 USD
Due:  19th Nov 2026

Challenge overview

Need

YPF, the Seeker for this Innocentive Challenge, is seeking innovative solutions, technologies, or devices suitable for removing internal deposits from pipelines used in its upstream operations in Argentina. Deposits such as paraffins, sediments, scale, sludge, and hydrocarbon residues can restrict flow, increase pressure losses, reduce operational efficiency, and affect product quality.

This Challenge offers the opportunity to demonstrate a practical cleaning approach that restores pipeline performance while minimizing downtime for maintenance, operational risks, resource consumption, and overall costs of intervention. Solutions must be suitable for existing infrastructure, including pipelines without dedicated, fixed ‘pigging’ facilities.

Approaches based on or similar to ice slurry cleaning, also known as ‘Ice Pigging™’ (SUEZ Group), are of particular interest. However, YPF also welcomes alternative approaches that can demonstrate reduced water/waste impact or superior cleaning effectiveness, operational flexibility, safety, and cost efficiency.

Successful proposals will comprehensively detail the cleaning mechanism, deposits and operating conditions it can address, infrastructure and resource requirements, and a credible description of the intended proof-of-concept (POC) activity for Solvers who are invited to run a potential operational validation in collaboration with YPF.

Collaboration Opportunity

This is a Scouting Challenge seeking a partner or supplier to provide systems and expertise to solve YPF’s business challenge; the Solver is invited to submit a written proposal to be evaluated by YPF with the goal of establishing a collaborative partnership.

The Challenge offers an award of a paid proof-of-concept (POC) with a budget of $20,000 USD. This initial validation step could enable the formalization of an agreement with the winning Solver and support progress toward full-scale implementation.

If the POC is successful, there may be the opportunity for future commercial engagement, subject to further discussions.

Submissions to this Challenge must be received by 11:59 PM (US Eastern Time) on November 19th, 2026.

Please review the later Participation Guidance section before submitting a proposal.

- Login or register your interest to start collaborating and scouting! –

Seeker/Eligibility

YPF is Argentina’s leading energy company and a pioneer in the development of unconventional resources in Vaca Muerta. With operations spanning production, refining, logistics, marketing and new energy sources, the company promotes open innovation as a means of tackling high-impact technological and operational challenges.

YPF seeks to collaborate with experts, entrepreneurs, start-ups, research centres and technology providers to accelerate the adoption of innovative solutions that generate value, improve efficiency and contribute to the transformation of the energy industry.

Employees of YPF are ineligible to receive an award for this Challenge.

Challenge

Background

YPF’s upstream team has identified the accumulation of internal pipeline deposits as a maintenance and operational challenge. Paraffins, sediments, scale, sludge, and hydrocarbon residues can reduce the effective internal diameter available for flow, increase pressure losses, and impair pipeline performance.

Cleaning methods currently considered by YPF include high-volume water flushing, chemical treatments, and conventional mechanical pigging. Pigging is the practice of sending a device, often called a ‘pig’ or ‘scraper’ through a pipeline to maintain, clean, or inspect it: without stopping the flow of the product.

Depending on the pipeline and deposit characteristics, these approaches may involve significant resource consumption, extended interventions, incomplete cleaning, or risks associated with blockage and equipment recovery.

Pipelines without dedicated pig launching and receiving facilities present an additional constraint. YPF therefore seeks approaches that can operate through suitable flow-aligned connections without depending on permanent pigging infrastructure.

Ice slurry cleaning offers one potential approach. Initially pioneered at the University of Bristol, UK, the primary global provider of ice slurry cleaning SUEZ describes its ‘Ice Pigging™’ as a process in which a pumpable ice slurry forms a semi-solid cleaning body within a pipe, carrying deposits through the system. The suitability of ice slurry usage for a particular upstream application must nevertheless be demonstrated against the relevant fluids, deposits, temperatures, and infrastructure used by YPF.

The Challenge

YPF seeks a pipeline cleaning solution, technology, or device that can remove internal deposits and restore hydraulic performance safely and economically. Proposals should describe how the cleaning mechanism works, which deposit types it addresses, and the evidence supporting its suitability for upstream operations.

The proposal should address paraffins, sediments, scale, sludge, and hydrocarbon residues, clearly distinguishing demonstrated capabilities from those requiring further validation. Where a solution cannot address a particular deposit type, Solvers should explain the limitation and any complementary treatment or interventions required.

Ice slurry solutions are welcome, alongside alternative physical, chemical, mechanical, or combined approaches that meet the requirements. No single technology is prescribed, but the solution should only require a connection aligned with the direction of flow.

Solvers should explain why their proposed approach is appropriate for the intended pipeline conditions and how it improves upon the relevant existing cleaning method.

Solvers should address the following factors when preparing their applications:

  • Cleaning effectiveness: including the characteristics of deposits removed, coverage, and limitations.
  • Hydraulic performance: the ideal solution should improve hydraulic performance, reducing product losses during use.
  • Intervention time and availability: including the time for the total duration of the solution’s use, any expected interruption to service or the product, time to return-to-service, and necessary cleaning frequency.
  • Safe execution and economic impact: cost of the solution, including relevant capital expenditure (CAPEX) and operating expenditure (OPEX), and key risks, limitations, and safety considerations.

The solution must be compatible with existing pipeline infrastructure and must not depend on dedicated, fixed pigging facilities. Gas and hydrocarbon transportation is carried out through carbon steel pipelines of differing diameters (ranging from 4” to 16”), and different lengths (with sections ranging widely from 300mm to up to 1km). Solvers should explain how their solution works, including the flow-aligned connection required for introducing the cleaning medium or equipment, paired with the outlet, recovery, isolation, and temporary equipment arrangements necessary to complete the intervention.

Proposals should also define the applicable operating envelope of their chosen approach and solution, including alignment with pipelines’ diameter and length, materials, internal geometry, pressure, temperature, fluid characteristics, and deposit loading. Any restrictions involving bends, branches, valves, diameter changes, internal coatings, or access points should be stated. Additionally, list any assumptions used within your approach.

All approaches should minimize the risk of pipeline damage, blockage, uncontrolled pressure excursions, loss of containment, and unacceptable product contamination. Solvers should identify credible failure scenarios and describe how the intervention can be monitored, stopped, and safely recovered if performance differs from expectations.

The proposed operating method should cover the following stages:

  • Preparation,
  • Isolation,
  • Cleaning,
  • Residue collection,
  • Verification,
  • and return to service.

Solvers should distinguish active cleaning time from the total intervention period, including mobilization, temporary connections, preparation, and recommissioning. Within the residue collection element of your proposal, Solvers should explain how removed deposits, displaced hydrocarbons, cleaning media, wastewater, or other materials will be collected and managed. Where product recovery is proposed, Solvers should distinguish recoverable product from contaminated material requiring treatment or disposal.

Finally, proposals should set out the plans for the POC and experimental validation of their solution, including technical and economic feasibility for broader deployment of their approach. This should include equipment availability, mobilization/presence in Argentina, personnel and training requirements, repeatability, maintenance needs, and the expected cost of subsequent cleaning campaigns.

Innovative and unconventional approaches are encouraged, provided they satisfy the challenge requirements of successful cleaning, and demonstrate necessary levels of technical feasibility, operational safety, and potential value for YPF.

Solution Requirements

YPF evaluation will consider effective cleaning and removal of buildup from the pipeline’s internal surfaces, compatibility with existing operating conditions, minimized operational disruptions, the need for a high level of operational safety, and the overall technical and economic feasibility.

Solvers should provide evidence appropriate to their stated readiness level, and display that they combine effective cleaning with credible routes to the POC and for wider implementation.

YPF is primarily interested in solutions which meet the following requirements:

Must have:

  1. Effective deposit removal: the solution, technology, or device must demonstrate the ability to remove deposits in pipelines, including identifying any performance evidence, limitations, or complementary treatments alongside the intervention.
  2. Infrastructure and operating compatibility: the solution must be compatible with the operating conditions outlined, and include a description of flow-aligned connections, outlets, recovery, and other arrangements for use of the solution.
  3. Safety and pipeline integrity: the solution should demonstrate a high level and keen awareness of operational safety, including presenting minimal to very low risk of pipeline damage or blockage. Proposed solutions should outline key hazards, operating limits, and monitoring requirements.
  4. Limited operational disruption: the solution must minimize disruption to services, and decrease maintenance downtime. Please describe the full process of the intervention, including timeline, costs, and details of any requisite ‘return-to-service’ activities that need to take place following the solution’s use.
  5. POC Activity Description and Feasibility: the solution must comprehensively detail the steps to undertake a POC of the proposed technology, including the Solver’s abilities to support the intervention test, costs, and risks.
  6. Credibility of the Solver: solutions must be backed by the technical knowhow and overall credibility of the applicant, particularly with regards to planning, operating, and supporting a potential POC.

Nice to have:

  • Reduced downtime or interruption to service compared to mechanical pigging or other traditional cleaning methods
  • Reduced water consumption compared with conventional methods
  • Reduced waste created by the use of the solution, chemical consumption, treatment and disposal requirements
  • Measurable increases to flow capacity, pressure consistency, and operational availability.
  • Increased product recovery through the solution/approach.

Out of scope / Things to Avoid:

  • Purely conceptual proposals without concrete evidence or credibility supporting their technical feasibility will not be considered.
  • Solutions that depend on permanent, dedicated mechanical pigging facilities will not be considered.
  • Standalone inspection, monitoring, or deposit-prevention tools that do not address the cleaning requirement will not be considered.

POC Evaluation and Subsequent Expansion

Following proposal evaluation, selected Solver(s) may be invited to develop and carry out a POC with YPF’s upstream team to determine credibility for the full award. Solvers should detail their expectations and abilities to support a POC activity, including regarding operating procedure, key performance indicators, risks and limitations, and additional support.

Solutions with Technology Readiness Levels (TRLs) 4-6 are invited.

Your Submission

Please login and register your interest, to complete the submission form.

The submitted proposals must be written in English or Spanish, and can include:

  1. Participation type – you will first be asked to confirm that you are participating in this challenge as a Solver (Individual) or Solver (Organization).
  2. Solution Level – confirm the Technology Readiness Level (TRL) of your solution.
  3. Partnering - there is the opportunity to run a POC for the best solution(s) at the conclusion of this Challenge. Please confirm that you are willing and able to support this key step of the Challenge, if selected.
  4. Problem & Opportunity - highlight the innovation in your approach to the Problem, its point of difference, and the specific advantages/benefits this brings (up to 500 words).
  5. Solution Overview - detail the features of your solution and how they address the SOLUTION REQUIREMENTS, including the cleaning mechanism, applicable deposits, operating limits, connection requirements, and confirmed compatibility without fixed pigging facilities (500 words, there is space to add more in attaching supporting data, diagrams, documents, etc).
  6. Solution Feasibility – Present the proposed POC approach, including preparation, equipment, timings, activities, milestones, relevant return-to-service requirements. Also add supporting information and rationale, such as references and precedents, that will help YPF evaluate and validate the feasibility of the solution (up to 500 words).
  7. Experience - Expertise, use cases and skills you or your organization have in relation to your proposed solution (up to 500 words).
  8. Solution Risks - any risks you see with your solution and how you would plan for this (up to 500 words).
  9. Timeline, capability and costs - describe what you think is required to deliver the solution, estimated time and cost, as well as any required staffing, maintenance, support and resources from YPF (up to 500 words).
  10. Credibility of Solver (whether an individual, team, or organization) - detail your experience and expertise in applying your proposed solution, and its plausible translation to this challenge need.
  11. Online References - provide links to any publications, articles or press releases of relevance (up to 500 words).

Participation Guidance

  1. Submission Close Date: Submissions to this Challenge must be received by 11:59 PM (US Eastern Time) on November 19th, 2026.
  2. Late submissions: Late submissions will not be considered.
  3. Multiple submissions, One Maximum: In case of multiple submissions by the same Solver, only one submission – the final one submitted – will be considered. Any other submissions will be deleted prior to evaluation.
  4. Submission form and attachments: Your submission will be evaluated by the evaluation team first reviewing the information and content you have submitted at the submission form, with attachments used as additional context to your form submission. Submissions relying solely on attachments will receive less attention from the evaluation team.
  5. Evaluation notification steps: After the Challenge submission close date, YPF will review and select the winning solutions according to the timeline in the Challenge header. Everyone who submits a proposal will be notified about the status of their submissions.
  6. Use of AI: Please note that any submissions produced solely with generative AI are not of interest.
  7. Learn more: Find out more about participation in Innocentive Challenges.

Use the slider to explore how the Challenge process works:

Register

Review & Accept

Submit

Win

To start solving this Challenge, log in to the Challenge Center or register as a Solver