Real-Time Verification of Manual Valve Position during Critical Product Transfers at YPF Facilities

26 Submissions
$20,000 USD
Due:  18th Nov 2026

Challenge overview

Need

YPF Industrialización Oil & Gas, the Seeker for this Scouting Challenge, is seeking solutions that can independently confirm the actual physical position of manual valves in its refinery and terminal operations, with real-time visualization of industrial operating data in AVEVA PI to detect changes, deviations, or out-of-sequence actions during product transfers.

A successful solution must integrate with existing manual valves without replacing or fully automating them, provide real-time monitoring, traceability, and deviation detection, and support future scaling across other YPF refineries and logistics terminals.

Proposed solutions should be sufficiently mature for pilot implementation under real operating conditions and scalable to other YPF refineries and logistics terminals.

Collaboration Opportunity

This is a Scouting Challenge seeking a partner or supplier to provide systems and expertise to solve YPF’s business challenge; the Solver is invited to submit a written proposal to be evaluated by YPF with the goal of determining interest in further business and collaboration discussions, including launching a $20,000 pilot, followed by full implementation.

The terms of any subsequent contract, including scope of work, tasks, and duration, will be determined directly with YPF. The monetary value of any additional contract will vary depending on the amount of work to be delivered and the agreed timeframe.

Submissions to this Challenge must be received by 11:59 PM (US Eastern Time) on November 18, 2026.

Please review the later Participation Guidance section before submitting a proposal.

Log in or register your interest to start collaborating and scouting!

Seeker/Eligibility

YPF is an Argentine energy company dedicated to the exploration, production, refining, distribution, and commercialization of gas, oil, and hydrocarbon derivatives. It is also involved in the sale of fuels, lubricants, fertilizers, plastics, and other products related to the industry.

It is one of the largest companies in Argentina and one of the most important oil companies in the region. YPF operates three refineries located in La Plata (Buenos Aires), Luján de Cuyo (Mendoza), and Plaza Huincul (Neuquén), as well as more than 1,600 service stations across the country (both company-owned and franchised).

Solvers must be legally established organizations, such as startups, companies, technology providers, system integrators, engineering firms, or academic and research institutions, with demonstrated technical, operational, and financial backing to assume overall responsibility for the proposal, execute the pilot end to end, and support the subsequent full-scale implementation of the solution if the pilot is successful. Proposals from individuals will not be considered.

Challenge

Background

YPF conducts an interplant transfer of a gasoline blend from a refinery to a logistics terminal. Before pumping begins, field operators at both facilities must manually open and close a defined set of valves in the correct sequence to establish the required transfer route.

Today, alignment is verified through an early field inspection during the operator’s daily round, radio communication between the console operator and the terminal board operator during the operation, and paper checklists. This approach depends heavily on manual intervention and does not provide real-time visibility into the actual valve positions. In addition, it is not feasible for the operator to monitor all valves in real time because of the distance between them, especially in the tank area.

A valve in the wrong position, a partially completed operation, operation of the wrong valve, or an unauthorized position change during transfer could divert the product to an unintended route. This could create a closed loop, contaminate another tank, or send the wrong product to the terminal, causing product quality impacts, operational interruptions, and significant economic losses.

The Challenge

How can YPF verify, visualize, and record in real time the physical position of manual valves during a critical product transfer between a refinery and a logistics terminal, using a solution that integrates with the currently installed valves without replacing or fully automating them?

Before pumping begins, the solution must digitally validate that all valves included in the transfer route are in the required position. It must also continuously monitor alignment throughout the operation and detect incorrect positions, incomplete movements, skipped steps, operation of the wrong valve, or any position change after the initial validation.

The solution must function as an additional safety barrier and will not replace the operator’s route verification duties or operational checks.

YPF seeks to complement current controls with independent, real-time verification of manual valve positions before pumping begins, while maintaining visibility and traceability throughout the transfer.

Solution Requirements

Proposed solutions should be sufficiently mature for pilot implementation under real operating conditions and scalable to other YPF refineries and logistics terminals.

Proposals from individuals will not be considered.

Must-haves

The proposed solution must:

  • Independently detect the actual physical position of each manual valve, including fully open (100%), fully closed (0%), and intermediate opening percentages, as a complement to operator confirmation and operational checks.
  • Provide a consolidated real-time view of valve status and alignment for field and control room personnel.
  • Record movements, status changes, validations, and detected deviations with date and time stamps.
  • Integrate with AVEVA PI or other industrial systems through standard protocols or APIs for future scale-up. During the pilot, a cloud-connected solution may be proposed, subject to YPF’s cybersecurity and data management requirements.
  • Install hardware on currently installed manual valves without replacing them, fully automating them, or interfering with normal operation, and preferably without requiring a process shutdown.
  • Be installable and suitable on valves of different types and dimensions, including motor-operated valves (MOVs).
  • Operate safely in hydrocarbon facilities, outdoor environments, and classified areas. Equipment installed in such areas must have ATEX certification or an equivalent applicable certification.
  • Be installable on valves for only a couple of days and then reassigned to another valve without issues. It must be possible for a field operator to install and calibrate the device, and the process should not take a long time.
  • Support dynamic device assignment: each time a device is installed or reassigned, it must be linked simply and unambiguously to the valve and location it will monitor during that period. The system must retain assignment history, indicating which device was installed on each valve and for what period.
  • Withstand mechanical use, including valves operated with a wrench or other tools, so that operation does not damage, miscalibrate, or interfere with the measurement device.
  • Preferably work with the WirelessHART gateway already installed at the refinery.
  • Include any additional equipment needed for the pilot, beyond the devices themselves, to ensure a successful pilot.
  • Detect deviations, including incorrect positions, incomplete movements, skipped steps, operation of the wrong valve, and any position change after the initial alignment validation.
  • Specify calibration frequency, service life, battery replacement, and preventive maintenance.
  • Detect and alert loss of signal, battery, or communication, and store data locally until connectivity is restored.
  • Specify environmental conditions, including temperature range, resistance to rain, dust, corrosion, vibrations, and IP rating.
  • Demonstrated technical, operational, and financial backing to assume overall responsibility for the proposal, execute the pilot end to end, and support the subsequent full-scale implementation of the solution if the pilot is successful.
  • All user interfaces, displays, alerts, and operator-facing information must be available in Spanish to ensure clear understanding and ease of use by field and control room operators.

Standards, Compliance, and Good Practices

Applicable standards and requirements, including IEC/ISA, classified areas, cybersecurity, and WirelessHART, will be defined in detail with the selected Solver during pilot planning.

Scalability

Demonstrate a viable path to scale the solution to other transfer routes, valve types, refineries, and logistics terminals within YPF.

Out of Scope

  • Submissions from Individuals without organization support to scale the solution across different industrial locations.
  • Valve replacement or conventional actuation of all valves.
  • Digital checklists without physical verification.
  • Technologies without a credible path to industrial use or use in classified areas.
  • Generic consulting proposals without a defined technical concept.
  • Replacement of the operator’s work.

TRL Range

Solutions with Technology Readiness Levels (TRLs) 7-9 are invited.

The Pilot

  • The Solver must supply the hardware and software and assume installation, integration, commissioning, testing, training, technical support, and any other resources required to execute the pilot end to end within the allocated budget.
  • The Solver must demonstrate technical, operational, and financial backing to execute the pilot and, if successful, support a subsequent full-scale implementation.
  • The Solver must define pilot support, response times, and assistance in the event of failures.
  • Pilot success criteria include accuracy, availability, number of valves, duration, installation time, and maximum number of false alarms.

Your Submission

Proposals may be submitted in English or Spanish and must include:

  1. Type of participation: indicate the type of legally constituted organization submitting the proposal, such as a startup, company, technology provider, system integrator, engineering firm, or academic or research institution. When applicable, indicate whether the organization owns the intellectual property of the proposed solution or is seeking partners.
  2. Solution maturity level: indicate the Technology Readiness Level (TRL) of the proposed solution and provide supporting evidence.
  3. Problem and opportunity: explain what is innovative about the proposed approach, how it differs from existing alternatives, and what specific benefits it offers (up to 500 words).
  4. Solution overview: describe the solution and explain how it addresses each Solution Requirement. Clearly identify any requirement that is partially met or not met, together with the relevant limitation, alternative, or required development. Additional information, data, diagrams, or supporting documents may be included in the summary field (up to 500 words).
  5. Solution feasibility: provide evidence supporting the technical and operational viability of the solution, such as references, prior experience, validation studies, prototype results, test data, or technical foundations (up to 500 words).
  6. Experience: provide evidence of successful implementations of similar solutions in any industry, including use cases, references, relevant experience, and the capabilities of the organization and proposed team (up to 500 words).
  7. Solution risks: identify the main technical, operational, implementation, cybersecurity, and scalability risks, and explain how they will be mitigated.
  8. Timeline and costs: provide a high-level Gantt chart for the pilot and subsequent implementation, including:
    1. Project phases, milestones, deliverables, and estimated duration.
    2. Cost per phase and total project cost, clearly distinguishing pilot costs, one-time implementation costs, and recurring costs.
    3. An integrated view of the timeline, responsibilities, and costs.
  9. Online references: provide links to relevant publications, technical documentation, case studies, articles, certifications, or press releases (up to 500 words).

Proposals must include all the information requested in this section and address each Solution Requirement individually. Any requirement that is only partially met or not met must be clearly identified and explained. Incomplete proposals may not be considered.

Participation Guidance

  1. Submission Close Date: Submissions to this Challenge must be received by 11:59 PM (US Eastern Time) on November 18, 2026.
  2. Late submissions: Late submissions will not be considered.
  3. Multiple submissions, One Maximum: In case of multiple submissions by the same Solver, only one submission – the final one submitted – will be considered. Any other submissions will be deleted prior to evaluation.
  4. Submission form and attachments: Your submission will be evaluated by the evaluation team first reviewing the information and content you have submitted at the submission form, with attachments used as additional context to your form submission. Submissions relying solely on attachments will receive less attention from the evaluation team.
  5. Evaluation notification steps: After the Challenge submission close date, YPF will review and select the winning solutions according to the timeline in the Challenge header. Everyone who submits a proposal will be notified about the status of their submissions.
  6. Use of AI: Please note that any submissions produced solely with generative AI are not of interest.
  7. Learn more: Find out more about participation in Innocentive Challenges.

Use the slider to explore how the Challenge process works:

Register

Review & Accept

Submit

Win

To start solving this Challenge, log in to the Challenge Center or register as a Solver